000 03590 a2200241 4500
005 20250805023423.0
100 _aMasangkay, Noel L.
_99072
245 1 _aUtilization of drip water system in the mine rehabilitation during the dry season /
_cNoel L. Masangkay.
300 _a117 leaves : illustrations
500 _bMasangkay, N. L. (2017). Utilization of drip water system in the mine rehabilitation during the dry season (Unpublished master's thesis). Public Management Development Program, Development Academy of the Philippines.
502 _aPublic Management Development Program
_bMiddle Managers Class
_cBatch 13
_dThesis (MMC)--Development Academy of the Philippines.
520 _aPursuant to Chapter XI Section 71 of the republic Act (R.A.) No. 7942 otherwise known as the Philippine Mining Act of 1995, mining contractors and permittees are required to rehabilitate excavated, mined-out, tailings and disturbed areas. The Mines and Geosciences Bureau (MGB), an attached agency of the Department of Environment and Natural Resources (DENR), si mandated by the above law to monitor the compliance of the mining permittees in undertaking rehabilitation activities as contained in their submitted and approved Annual Environmental Protection and Enhancement Program (AEPEP). The compliance of the permittees is one of the Major Final Output (MFO) of the agency. In as much as the rehabilitation activities are being conducted annually, the effects of climate change all over the world have debilitating effects on the planted trees that resulted in high mortality. Due to climate change, there are less rain and longer dry months. As a result of this, mining contractors cannot sustain watering the planted trees during the lean season because of insufficient water supply. Normally, the company supplies eight (8) liters a day per planted tree using flooding method, and for a hectare with 2,500 endemic trees planted, the water requirement for a hectare is 20,000 liters of water equivalent to Php542,485.80 for the three-month project implementation. The drip water system was installed in the pilot test rehabilitated area to bridge the gap between the rainy and the dry season. The system was not only economical in terms of water consumption where only 2.83 liters of water was being required and directed to the rooting system of the tree through micro hoses, thereby eliminating wastage through unintended water channeling, but also required less capital. For a hectare planted woth 2,500 trees, the total amount is only Php41,245.62 for a five-year life of the system. As a result of the application of the drip water system where all the planted trees survived the dry summer months, the DENR, the lead government agency in the monitoring of the status of rehabilitated disturbed areas, recommended the installation of the drip system to other disturbed areas before the next dry months.
650 _aMining--Rehabilitation programs
_zPhilippines.
_920253
650 _aMining--Rehabilitation activities
_zPhilippines.
_920254
650 _aWater shortage.
_920255
650 _aWater supply.
_917756
610 _aDepartment of Environment and Natural Resources (Mines and Geosciences Bureau).
_920256
700 _aPenaflor, Richard G. (Faculty Adviser)
_95566
700 _aGaliste, Ellengrace R. (Institutional Partner)
_99078
700 _aGapuz, Michael L. (Program Representative)
_94752
856 _21
_30
_qpdf
_uhttps://library.dap.edu.ph/cgi-bin/koha/opac-retrieve-file.pl?id=da8f69cbc59d6dbbe9aa8dc94eb31c64
_yView Digital Copy
_1STAFF
942 _cTH
_2lcc
999 _c2411
_d2411