Enhancing Bangko Sentral ng Pilipinas-Security Plant's Efficiency Through Improved Safety Management of Construction Projects / (Record no. 1124)

MARC details
000 -LEADER
fixed length control field 04266 a2200217 4500
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20250805023420.0
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Linaban, Erizelle N.
9 (RLIN) 4753
245 1# - TITLE STATEMENT
Title Enhancing Bangko Sentral ng Pilipinas-Security Plant's Efficiency Through Improved Safety Management of Construction Projects /
Statement of responsibility, etc. Erizelle N. Linaban.
300 ## - PHYSICAL DESCRIPTION
Extent 115 leaves : illustrations
500 ## - GENERAL NOTE
-- Linaban, E. N. (2015). Enhancing the Bangko Sentral ng Pilipinas-security plant's efficiency through improved safety management of construction projects (Unpublished master's thesis). Public Management and Development Program, Development Academy of the Philippines.
502 ## - DISSERTATION NOTE
Department Public Management and Development Program
Program Middle Managers Class
Batch Batch 5
Additional Note Thesis (MMC)--Development Academy of the Philippines.
520 ## - SUMMARY, ETC.
Summary, etc. The production operations of the Security Plant Complex (SPC) are affected when construction projects are implemented without regard for safety and environment. Several production interruptions reported and audit findings cited point to the poor safety management of construction projects as the basic cause. The best solution in addressing this problem is a prevention-based mechanism that incorporates safety and environmental considerations in planning, execution and control of projects. Planning. The Re-netry Project established a Standard Safety Environment Requirements for Infrastructure Projects (Safety Standards) approved by the SPC management for implementation and incorporation into the project Terms of Reference. A supplemental Guide to Planning and Implementing Safety (Guide to Safety) which contains estimating reference for safety costs and a checklist in using the safety and environment standards was also approved and issued. With the approval of the Safety Standards, SPC has established clear policies in preventing accidents and incidents from construction projects. It has established a clear guide for project planners to incorporate safety and environmental aspects in the planning of projects, including safety and environmental costs. Execution. The Re-entry Project also increased the capability of personnel involved in the execution of construction projects. Through their participation in the Construction Occupational Safety and Health training, a 40-hour training required by the Department of Labor and Employment for all personnel involved in construction project supervision, more that 80% of the project personnel increased their competency on construction safety. These personnel also gained skills in identifying hazards and recommending actions for better implementation and execution of projects. Selected training participants conducted knowledge sharing activities through an echo training session attended by technical outsourced personnel, who are hired on project-basis. Technical outsourced personnel increased their construction safety awareness through the echo session. Control. The Re-entry Project improved the existing control mechanism of contractor's safety performance through the adoption of the Construction Safety Audit. The document adopts the Safety Standards as the basic audit parameters and rating system to ascertain the contractor's safety performance. Contractors are directed to achieve final audit rating of at least "Satisfactory" in order to qualify for the issuance of a Certification of Satisfactory Performance, a certification required to establish eligibility to bid for future projects. Audit reports are now required to be part of the Quality Management System's Management Review. The inclusion of these safety audit reports in the Management Review provides policy directions and policy formulation for the continual improvement of managing construction safety.
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Construction safety practices.
9 (RLIN) 18223
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Building
General subdivision Safety measures.
9 (RLIN) 18224
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Abanto, Arnel D. (Faculty Adviser)
9 (RLIN) 4756
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Ilustre, Immaculate P. (Institutional Partner)
9 (RLIN) 4757
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Caparros, Nanette C. (Program Representative)
9 (RLIN) 4758
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Elizabeth Y. Manugue (ReP Faculty Lead)
9 (RLIN) 4759
856 ## - ELECTRONIC LOCATION AND ACCESS
Access method Yes
Materials specified No
Electronic format type pdf
Uniform Resource Identifier https://library.dap.edu.ph/cgi-bin/koha/opac-retrieve-file.pl?id=6a53e9aa937e9bf118d4fbc34a72105c
Link text View Digital Copy
Group STAFF
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type THESIS
Source of classification or shelving scheme Library of Congress Classification
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Date acquired Total Checkouts Full call number Barcode Date last seen Date last checked out Price effective from Koha item type
    Library of Congress Classification     MAIN MAIN 01/16/2016 1 TH 443 L56 2015 c.1 TD00482 05/30/2019 05/30/2019 09/16/2022 THESIS
    Library of Congress Classification     MAIN MAIN 01/16/2016   TH 443 L56 2015 c.2 TD00828 01/16/2016   09/16/2022 THESIS

@2022 DAP | Powered by: Koha | Designed by Onstrike Library Solutions