"Good housekeeping" of road projects in the Cordillera Administrative Region (CAR) / (Record no. 2018)

MARC details
000 -LEADER
fixed length control field 03820 a2200229 4500
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20250805023422.0
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Duyo, Ruth S.
9 (RLIN) 7870
245 1# - TITLE STATEMENT
Title "Good housekeeping" of road projects in the Cordillera Administrative Region (CAR) /
Statement of responsibility, etc. Rut S. Duyo.
300 ## - PHYSICAL DESCRIPTION
Extent 75 leaves : color illustrations
500 ## - GENERAL NOTE
-- Duyo, R. S. (2015). "Good housekeeping" of road projects in the Cordillera Administrative Region (CAR) (Unpublished master's thesis). Public Management Development Program, Development Academy of the Philippines.
502 ## - DISSERTATION NOTE
Department Public Management Development Program
Program Middle Managers Class
Additional Note Thesis (MMC)--Development Academy of the Philippines.
520 ## - SUMMARY, ETC.
Summary, etc. The Re-Entry Project Entitled "Good Housekeeping" of Road Projects in the Cordillera Administrative Region" envisions being the instrument in minimizing, if not totally negating, the occurrence of additional routine maintenance need from projects under warranty, on-going, and substantially competed road infrastructure and preventive works. This is done through the development of an Inspection Checklist patterned from Department Order 53 or "Clearing of Project Site Upon Completion" before payment of final billing of every contract (Fernanco, 2003) and Republic Act 9184 Section 62, paragraph 62, paragraph b, which reads as: "The contractor shall be fully responsible for the safety, protection, security, and convenience of his personnel, third parties, and the public at large, as well as the works, equipment, installation and the like to be affected by his construction work: (Philippines, R.A. 9184 Philippine Gazette, 2002). The development of the checklist was in collaboration with the Regional Quality Assurance Unit of the Department of Public Works and Highways Cordillera Administrative Region (DPWH-CAR), reviewed, edited, and endorsed for approval by the Division Chiefs of the Construction, Planning and Design, Quality Assurance and Hydrology, and Maintenance Division, and again reviewed, edited, and approved by the Regional director of DPWH-CAR for implementation and adoption. The Inspection Checklist itemized the areas of concerns that need to be addressed before a work item or project is cleared for payment. Some of the items in the checklist are oftentimes neglected and this usually results to back-job or corrective work that accrues to the contractor or most of the time to the maintenance unit of the agency. With the use of the Inspection Checklist, the Agency is assured that only projects complaint to D.O 53, series of 2003 and R.A 9184 Section 62 are cleared for payment and on the part of the Contractor, such requirement are made clear beforehand leading to a well-planned, pro-active, and efficient way of correcting project deficiencies. The ReP title "Good Housekeeping" of New Road Projects literary means no routine maintenance needed and no additional responsibility on road safety to the Maintenance unit of the agency that would emanate from new projects; thus, no additional cost will be required from the government's budget allocation for at least from the time the contract is awarded up to its designated warranty period (Congress, 2013) and preventive maintenance intervention sch as asphalt overlay and re-blocking will be done at a later period and not on a newly paved road.
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element DPWH - CAR.
9 (RLIN) 19751
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Road projects.
9 (RLIN) 19752
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Road construction
Geographic subdivision Philippines--CAR.
9 (RLIN) 19753
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Agustin, Nicasio Angelo J. (Faculty Adviser)
9 (RLIN) 18734
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Antonio, Nelia I. (Institutional Partner)
9 (RLIN) 7874
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Ferrer, Veronica
9 (RLIN) 18508
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name (Program Representative)
9 (RLIN) 5534
856 ## - ELECTRONIC LOCATION AND ACCESS
Access method Yes
Materials specified No
Electronic format type pdf
Uniform Resource Identifier https://library.dap.edu.ph/cgi-bin/koha/opac-retrieve-file.pl?id=0777f1fe6467ec04ab59fd58bb4d8f3f
Link text View Digital Copy
Group STAFF
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type THESIS
Source of classification or shelving scheme Library of Congress Classification
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Date acquired Total Checkouts Full call number Barcode Date last seen Price effective from Koha item type Date last checked out
    Library of Congress Classification     MAIN MAIN 04/18/2017   HT 166 D89 2015 c.1 TD00612 04/18/2017 09/16/2022 THESIS  
    Library of Congress Classification     MAIN MAIN 04/18/2017 2 HT 166 D89 2015 c.2 TD01032 12/13/2019 09/16/2022 THESIS 12/11/2019

@2022 DAP | Powered by: Koha | Designed by Onstrike Library Solutions